Friday, April 29, 2011

Brought to you by the letter R

Nathan Phillips Square construction continues: The washroom/skate rental/elevator building has been ripped down and its replacement is going up and the Peace Garden/Eternal Flame have also been removed, apparently the flame was just temporary. Here is a shot of the Peace Garden dismantling going on during winter. You can check out the winning design here.
The flags along Bay Street are still up.

Related Posts by Categories



Widget by Hoctro | Jack Book

No comments:

Doors Open

Scarborough Bluffs

Pride

Redball

Beaches

Graffiti

Lake Ontario

Nathan Phillips Square

Transportation